Save Over $14,285 Daily! VPSA Oxygen Generation Plant Helps China’s Largest Steelmaker to Cut Costs and Boost Efficiency
On November 28, 2024, the new VPSA (vacuum pressure swing adsorption) oxygen generation unit built by PKU Pioneer for Anhui Changjiang Steel Co., Ltd. (hereinafter referred to as Changjiang Steel) was completed after more than 2 months of intensive construction. Following 2 days of debugging and connection with the existing liquid oxygen supply pipeline system, the VPSA oxygen equipment was officially put into operation on November 30 to supply cost-effective enriched oxygen (12,500Nm3/h, 80%) to 2 blast furnaces (1080m³ and 1250m³), which will significantly reduce the client’s molten iron production costs and enhance its competitiveness in the highly competitive steel market.